Nevitt Park Pedestrian and Bicycle Bridge

Client

City of Phoenix

Location

Phoenix, Arizona

Delivery

Design Bid Build

Date Completed

August 2016

This project included the installation of a 10-foot wide prefabricated steel truss bridge spanning across the Western Canal at the 46th Street alignment just north of Vineyard Road. It also included construction of a 8-foot-wide pathway connection to Nevitt Park, modifications to the canal bank maintenance road and landscaping in the park. The Banicki team worked directly with SRP to shut down power lines as needed throughout construction to maintain safe working conditions.