Panther Drive Bridge
Client
TOWN OF SUPERIOR
Location
SUPERIOR, ARIZONA
Delivery
Structures, JOC
Cost
$3.25M
Date Completed
July 2025
DESCRIPTION
Banicki replaced the existing low-water crossing at Panther Drive with a new super-box type bridge designed to safely convey Queen Creek storm flows and provide reliable year-round access for the Town of Superior. The project included construction of new bridge foundations, abutments, piers, and reinforced concrete deck, along with approach slabs, bridge barrier, and roadway tie-ins.
Supporting work involved substantial earthwork, structural excavation and backfill, asphalt paving, curb and gutter, sidewalks, and installation of gabion mattresses for scour protection. Banicki coordinated closely with SRP to perform construction within the utility right-of-way and implemented stormwater control and dewatering systems to maintain safe working conditions.














