Hard Bid

A Hard Bid procurement is where the Owner hires a designer who then draws up project plans. After the creation and approval of the plans, the Owner bids the work out to qualified General Contractors either through invitation or advertising the bid. The lowest bidder wins the project and moves to the construction phase. At Banicki we have been involved in this delivery method since 1991.

Design Build

Design Build is a method of project delivery in which a General Contractor joins up with a Designer and creates a Design Build team. The Design Build team works under a single contract with the Owner to provide design and construction services. One entity, one contract, one unified flow of work from the initial concept through final completion. Banicki has had several successful Design Build projects and partnerships with Designers and Owners.

Job Order Contracting

A JOC is a qualifications based selection delivery method that Owners will utilize for smaller, repetitive, or commonly encountered construction projects. Usually a JOC will be a multi-year contract for a wide variety of tasks. An Owner will select a JOC contractor and distribute work through a task order or a job order agreement which will have the pertinent information for the task. Banicki has been involved in JOC work since 2006 and has successfully completed several hundred tasks.

CMAR

The CMAR deliver method involves a qualifications based selection process in which an Owner selects a Contractor to be their CMAR. After the selection of the CMAR by the Owner, the CMAR will enter into a Pre-Construction agreement and assist the Owners designer in completion of the project plans. The CMAR will perform plan reviews, constructability reviews and budgeting along the way. Once the plans are complete, the CMAR will give the Owner a price for the work. The Price is referred to as a Guaranteed Maximum Price (GMP). Banicki has numerous CMAR projects on our resume with varying scopes as a builder and as a consultant of the CMAR process.

Alternate Delivery Methods

Our alternative delivery project management approach focuses on budget control,  schedule viability, value engineering and constructability.  Whether the project is Design – Build (DB), Design – Bid – Build (DBB), Construction Manager at Risk (CMAR) or Construction Manager General Contractor (CMGC) or JOC, Banicki has the in-house experience to meet your needs with a best value and progressive schedule solution.

Other Construction Services

Preconstruction Services

Our project controls management group, led by Don Davis, LEED AP, leads a team consisting of estimators with more than 60 years of combined experience as well as engineers, constructability and value analysis personnel as needed. This group will lead value analysis and conceptual estimates throughout the preconstruction phase, total project estimating and GMP modeling as necessary as well as preparing and maintaining resource loaded schedules.

Construction Services

The construction services team is lead by an Operations Manager, Project Managers and Superintendents with more than two centuries of combined experience in heavy civil and aviation construction. Daily field construction will be overseen by individual superintendents reporting to the Project Manager, who has overall responsibility for meeting project budget, schedule and goals. The team will provide necessary information to make accurate and timely decisions throughout the construction phases, ensuring delivery of completion milestones.

Planning Systems

The Banicki team utilizes the Last Planner Method from the Lean Construction Institute to ensure successful field level execution of design services efforts. During design services, all project team members and stakeholders will hold a Project Team Baseline Development Conference (PTBDC). Participants will fully itemize their scope and realistic durations to each activity, and then collaborate with all other partners to develop the most efficient sequence to completing the project on time.

Scheduling Systems

Banicki uses Primavera P6® to develop an hour by hour CPM Schedule for design and construction. Banicki will collaborate with the client to formulate the design services schedule. We develop the resource loaded construction baselines based upon the outcomes of initial preconstruction meetings. These are included in all bidding packages in order to communicate the intended means, methods and demands for completing the project on time.

Estimating Systems

Each comprehensive bid package will contain a scope letter, available plans and specifications, bid schedule, baseline construction schedule, required compliance forms and all other pertinent information. All subcontractors will be required to participate in the design review and the PTBDC in order to be considered responsive.

Construction Manangement

The Banicki team recognizes the importance of a seamless team effort. Our construction management approach is centered on creating open communication at all levels of project work – from our Owners to craft workers in the field. The Banicki Team prides itself on its ability to adapt to challenging and changing field conditions. We leverage our extensive experience to provide effective construction durations, assuring best delivered value for our clients.

Job Order Contracting Division

For over 15 years, the Banicki has provided the correct staffing, resources and materials to address the specific needs of JOC work. In 2004, we formed a dedicated JOC Division, with a Division Manager and personnel that work only on JOC contracts. Banicki will leverage these specialized resources, experience and knowledge to ensure best value of every work order assigned.

Banicki is recognized for its superior JOC management process, award-winning partnering methodology and technical capacity. Banicki brings key elements to the JOC management process including:

  • A highly qualified and experienced JOC Management Team with a proven track record of successfully delivered JOC and on-call contracts and task orders.
  • An established firm history of successful public works and infrastructure improvements project delivery.
  • A corporate culture centered on worker safety.
  • A comprehensive understanding of the need and value for community and stakeholder involvement.
  • A construction approach focused on using the right personnel for the job, continued skill education and development at all levels of our organization.
  • A firm structure and methodology for incorporating quality subcontractors into the project life cycle.
  • An ongoing strong reputation for well established, cooperative working relationships with municipalities, utility stakeholders and subcontractors across Arizona.