DESCRIPTION The Teravalis Soil Cement & Riprap project delivered large-scale drainage infrastructure to support the phased buildout of the 37,000-acre Teravalis master-planned community in Buckeye, Arizona. Spanning more than 19... read more →
DESCRIPTION Banicki delivered this large-scale drainage infrastructure project as part of early-phase development for Teravalis, the 37,000-acre master-planned community by Howard Hughes in the West Valley. The scope of the... read more →
DESCRIPTION The SR 179 Pedestrian Crossing at Oak Creek created a grade-separated pathway beneath Sedona’s main arterial to improve safety, reduce congestion, and connect the city core with the Tlaquepaque... read more →
DESCRIPTION This project delivered a vital pedestrian and multimodal connection within the Indian Bend Wash Path by constructing a large box culvert beneath Chaparral Road to link two existing parks.... read more →
DESCRIPTION Delivered at best value for Maricopa County, this major intersection project involved the complete phased reconstruction of the MC 85 and 91st Ave intersection, as well as arterial road... read more →
DESCRIPTION Performed at best value for the Town of Florence through ADOT, this intricately phased project involved the construction of two new traffic circles at the complex intersections of SR... read more →
AWARDS 2025 APWA Project of the Year Award, Disaster/Emergency Repair Category 2025 ACPA Project Achievement Award 2024 Arizona Transportation Partnering Excellence Award DESCRIPTION This emergency flood control CMAR project for... read more →
AWARDS 2025 APWA Project of the Year Award, SCRC Transportation Category 2024 Arizona Revitalization Project of the Year by Phoenix Magazine 2024 ACEC Arizona Engineering Excellence Awards Honor Winner 2024... read more →
DESCRIPTION This project involved the construction of a two-mile, 10-foot-wide multi-use pathway along a canal bank, designed to improve pedestrian and bicycle access for surrounding neighborhoods. Banicki’s scope included the... read more →
DESCRIPTION Delivered at best value for the City of Phoenix, this environmentally sensitive heavy civil project involved constructing a 2.33-mile shared-use pathway along the south bank of the Salt River,... read more →