BNSF Glendale Intermodal Facility & Yard Expansion

Client

BNSF Railway

Location

Glendale, AZ

Cost

$22.2M

Date Completed

April 2020

AWARDS

  • Arizona AGC – 2021 Build Arizona Project of the Year – Private New Construction: Over $10M – Heavy Industrial

PROJECT DESCRIPTION
This award-winning project expanded the parking and storage capacity for inbound and outbound shipping containers at BNSF Railway’s intermodal facility in Glendale by fully developing a newly acquired property, Lot 6, and reconstructing existing Lot 5. The project had an aggressive schedule bounded with calculated milestones in order to not impact concurrent BNSF Operations or peak shipping seasons. BNSF’s Glendale IMF ran under 24/7 operation with incoming and outgoing trains every four hours that accounted for 685 daily shipping container lifts. Banicki worked diligently with BNSF Operations and Facility Maintenance to confirm train movements and to ensure our construction activities would not impact their transports. Banicki’s development and communication of comprehensive project scheduling, as well as diligent site security and delineation, were paramount to the success of the project and critical to keeping train activity and other complex operations active and undisturbed.

VALUE ENGINEERING
Banicki successfully value engineered the elimination of 6,803 SF of concrete retaining wall in order to better accommodate positive drainage across the large site area. Finished grade varied 18-24 inches between sections of Lot 6, thus the original design called for a four-foot cast-in-place retaining wall to be constructed to contain the new pavement at these grade variations. Banicki’s alternative to this design worked flawlessly and involved eliminating the retaining walls by grading a slope between grade variations and applying fiber reinforced shotcrete to the face of the slope after final paving.

UNIQUE STRUCTURAL SCOPE

  • Demolition of 19 existing structures
  • 8,300 SF steel framed state of the art maintenance building to house gantry cranes and hostlers

UNIQUE CIVIL SCOPE

  • 100,000 SY AC pavement demolition
  • 43,000 SY PCCP demolition
  • 37 acres of subgrade lime treatment and fine grading
  • 41,135 CY PCCP
  • 41,055 tons AC pavement
  • Two new intermodal tracks totaling 5,700 track feet
  • New lighting, security cameras, and electrical gates