Mesa Gateway Shared Use Path

Client

City of Mesa

Location

Mesa, Arizona

Delivery

Design Bid Build

Cost

$1.9M

Date Completed

January 2022

The scope of this project encompassed the construction of a 1.8-mile-long, 10-foot-wide asphalt multi-purpose pathway along Loop 202, stretching from Elliot Road to Hawes Road. The undertaking demanded thorough coordination with the Arizona Department of Transportation (ADOT) and embraced a diverse array of transportation-related tasks.

Key components of the project included fine grading, the installation of new asphalt pavement, and the implementation of new traffic signals on Warner Road. Additionally, the project featured the application of thermoplastic crosswalks, the construction of concrete flatwork, the installation of ADA ramps, and the incorporation of hardscape elements such as brick pavers. To enhance the visual appeal and functionality, architectural landscaping was integrated, accompanied by irrigation lines to support the greenery. Along the entire length of the pathway, solar-powered lighting was strategically installed, contributing to both safety and sustainability measures. The successful execution of this project required a comprehensive approach, combining infrastructure development with aesthetic and functional enhancements.