Stadium Trail Phase II; 75th Ave to Skunk Creek
Client
City of Peoria
Location
Peoria, Arizona
Delivery
Design-Bid-Build, Structures
Cost
$3.68M
Date Completed
October 2025
AWARDS
DESCRIPTION
The Stadium Trail Phase II project delivered a critical segment of Peoria’s regional trail network by constructing a new multi-use pathway and installing a 140-foot prefabricated steel pedestrian bridge over Skunk Creek. This work closed a longstanding gap between major trail corridors and enhanced access to the Peoria Sports Complex, the P83 Entertainment District, and surrounding neighborhoods. The project required disciplined sequencing, extensive flood-control stabilization, and close coordination with the City of Peoria, ADOT, FCDMC, USACE, Jacobs, and Stinger Bridge & Iron.
Crews executed major removals, channel grading, grouted and dumped riprap, drilled shafts, structural concrete, bridge construction, and trail paving while maintaining public access within a heavily used recreation corridor. Banicki also collaborated with FCDMC to revise outdated riprap specifications, a solution that enabled timely delivery and improved future flood-control work valley-wide. The result is a durable, safe, and highly connected trail system that strengthens mobility and recreation opportunities for thousands of users.
















