Banicki Construction Banicki Construction Banicki Construction Banicki Construction
  • Projects
    • Design-Bid-Build
    • Aviation
    • Structures
    • CMAR
    • Design-Build
    • JOC
    • Featured
  • Company
    • About
    • Leadership
    • Sterling
    • Safety
    • Careers
  • News
    • Updates
    • Awards
  • Services
  • Contact
  • Subcontractor Portal
Banicki Construction Banicki Construction
  • Projects
    • Design-Bid-Build
    • Aviation
    • Structures
    • CMAR
    • Design-Build
    • JOC
    • Featured
  • Company
    • About
    • Leadership
    • Sterling
    • Safety
    • Careers
  • News
    • Updates
    • Awards
  • Services
  • Contact
  • Subcontractor Portal

JOC

Banicki Construction

Fare Collection System Modernization (FCSM) Site Development: Work Packages #01 – #04

DESCRIPTION Performed under our current Valley Metro JOC, these high-profile task orders included installing electrical and civil infrastructure for new Stand-Alone Validators (SAV) as part of Valley Metro’s Fare Collection... read more →

Sunset Drive Crossing Drainage Improvements

DESCRIPTION Performed for the City of Sedona through a Cooperative Purchasing Agreement with the Arizona Department of Administration, this high-profile job order encompassed a broad range of drainage, roadway, and... read more →

75th Avenue & ACDC Bridge

DESCRIPTION This project order featured deck joint seal replacements and safety enhancements at three separate bridge locations. At the 75th Ave ACDC bridge, scope included replacing deck joint seals; new... read more →

Sun Valley Parkway Box Culvert Cleaning, Phases 1-3

DESCRIPTION Performed for MCDOT over three continuous years, these projects utilized Banicki’s low profile remote-controlled loaders (34” and 36”) to perform sediment cleanout of 83 box culverts along Sun Valley... read more →

Power Road Widening

DESCRIPTION This accelerated project included adding a new second lane to southbound Power Road between Nunneley Road and Warner Road in the rapidly expanding town of Gilbert. This project had... read more →

Gila Bend Emergency Storm Damage Repairs

DESCRIPTION This emergency project consisted of removing and replacing both directions of Old US Hwy 80 at a low water crossing in Gila Bend that had washed out from rain... read more →

El Mirage Roadway Reconstruction

DESCRIPTION Completed in only 35 working days, this accelerated project for Maricopa County included ½ mile of full depth roadway reconstruction and ½ mile of 2” mill and overlay. Three... read more →

91st Ave at MC 85 Intersection Civil Work

DESCRIPTION This project included utility relocations and civil upgrades at the 91st Ave and MC 85 (Buckeye Road) intersection. Banicki partnered with SRP to perform the demolition, backfill, and roadway... read more →

Phoenix Zoo Parking Lot – Phase II

DESCRIPTION This high-profile project at the Phoenix Zoo included pavement preservation and rehabilitation of existing parking lots A, B, and C as well as the full reconstruction of the bus... read more →

Phoenix Zoo Parking Lot – Phase I

DESCRIPTION This project included the development and construction of a brand new 6-acre asphalt parking lot in undisturbed desert soils for the Phoenix Zoo. The new parking lot was immediately... read more →
  • 1
  • 2
  • 3
  • 4

« Previous Page — Next Page »

© 2025 Banicki Construction. All Rights Reserved.