Sterling Infrastructure, INC
Subcontractor Portal
Sterling Infrastructure, INC
Subcontractor Portal
Projects
Services
Company
About Us
Careers
News & Media
Contact
Projects
Services
Company
About Us
Careers
News & Media
Contact
Projects
ALL PROJECTS
CMAR
Aviation
Design Bid Build
Design-Build
Featured
Job Order Contract (JOC)
Private Competitive
Structures
Schultz Creek Crossing – Mount Elden Lookout Road
OMC Guard House & Shade Canopy
Back O’ Beyond Low Water Crossing Improvements
Solano Park Skate Plaza
SRP – TSC Drainage Improvements – Phases 1 Through 4
Paradise Lane at Skunk Creek
El Mirage Roadway Construction
Bloody Tanks Wash Channel Rehabilitation
TPSS #21 Transformer Replacement
Avondale Bus Stop (Van Buren & Links)
Hermosa Drive UP Bridge #1368
Fare Collection System Modernization (FCSM) Site Development: Work Packages #01 – #04
Bagdad Airport Runway 5 / 23
Meridian Road – Queen Creek to Germann
North Gateway Transfer Station
Upper Red Rock Loop Road
Brandis Channel Cleaning
Ancient Trail Reconstruction
Emergency Storm Pipe Repair – Old US 80
Terminal 4 South Concourse 1 Apron
75th Avenue & ACDC Bridge
Drainage Repairs – Meridian & Roosevelt MITS
Phoenix Zoo Parking Lot – Phase II
Mesa Gateway Shared Use Path
W. Willcox TI UP Bridge
CMAR – Terminal 4 North Apron Reconstruction, GMP’s 1-6
91st Ave at MC 85 Intersection Civil Work
Gila Bend Emergency Storm Damage Repairs
CMAR – Bellemont Access Safety Improvements
Post Office Canyon Bridge
Jomax Parkway Improvements
CMAR – Runway 3 / 21 Reconstruction
Sedona Mill & Overlay
Tempe Town Lake LRT Bridge – Fire Damage Repair
Infrastructure for Spaceport Development Design-Build
Power Road Widening
Sunset Drive Crossing Drainage Improvements
Short Line Thermoplastic Lighted Intersections
Avondale Bus Stop (Riley & 10th Avenue)
Phoenix Zoo Parking Lot – Phase I
Jim Camp Wash Bridge & Cottonwood Wash Bridge (US 180)
Sun Valley Parkway Box Culvert Cleaning, Phases 1-3
128th Street Box Culvert
Runway 5 / 23 Reconstruction & Electrical Upgrades
Rental Car Center Concrete – Sky Train® Stage 2
BNSF Glendale Intermodal Facility & Yard Expansion
West Terminal Station Concrete – Sky Train® Stage 2
T3 North Service Road
Arizona Avenue Improvements
Verrado & Van Buren Improvements
Yuma – Casa Grande Highway / I-8 Araby Road T.I.
Rio Salado Pathway: SR143 – 32nd Street
Southwest Mesa Bicycle and Pedestrian Pathway
Monroe Avenue Beautification, Phases I – III
Glendale Bridge Repair Program
Rio Salado Pathway SR-101L to Dobson
Drainage Improvements – Patton Road at 210th Ave
Prescott Valley Pipeline Multi-Use Path
Nevitt Park Pedestrian & Bicycle Bridge
DVT North Apron Reconstruction
CMAR – LAX 2nd Level Roadway Construction
Posse Grounds Bike Skills Park
CMAR – Uptown SR89A Roadway Reconstruction
DVT Acute Angle Connectors A6 & A8
Terminal 4 South Apron Reconstruction
DVT Taxiway A Relocation & Reconstruction
CMAR – Westplex Taxilane Reconstruction
CMAR – Airfield Safety Enhancements – GMP 1 / Drainage & Erosion Protection – GMP 2
DVT South Apron Reconstruction, GMP’s 1-4
Runway 7R / 25L Emergency Access Road
© 2023 Banicki Construction. All Rights Reserved.